   Client : UTEL/DTAC
   Location: Northeastern, Southern, Central Thailand- 120 BTS sites
   Contract Value : THB 130,000,000
   Contract period : 2002 to 2006
   Scope : Site preparation, equipment installation for GSM base
   Client : Alcatel (Thailand) Co.,Ltd.
   Location : Central, West, North-East & South Thailand -110 BTS sites
   Contract Value: THB102,000,000
   Contract period: June 2001 to April 2004
   Scope: Turn-key site preparation work for GSM base stations
   Client : A.I.S. Phase 11
   Location : Southern Thailand - 5 BTS sites
   Contract Value: THB 14,000,000
   Contract period : September 2002 to March 2003
   Scope : Design and construct GSM base stations
   Client : TA Orange
   Location : Throughout Thailand -940 BTS sites
   Contract Value : THB 980,000,000
   Contract period : April 2002 to October 2006
   Scope : Design,supply and construct GSM 1800 base stations
   Client : Alcatel Thailand 
   Location : Southern Thailand-24 km 120 fibre cable
   Contract Value : THB 4,000,000
   Contract period : May 2003 to March 2004
   Scope : Installation and jointing of aerial and buried optic fibre.

   Client : Lucent Technologies
   Location : Hanoi,Vietnam-1 MSC+4 BTS sites
   Contract Value : THB 2,500,000
   Contract period : January 2004 to June 2004
   Scope : Design and install CDMA BTS sites and one MSC

   Client : TA Orange
   Location : Throughout Thailand -160 km 12&24 fibre optic cable
   Contract Value : THB 28,000,000
   Contract period : November 2003 to June 2004
   Scope : Installation and jointing of aerial optic fibre cable

   Client : Chiva Som International Health Resorts
   Location : Hua Hin -Thailand
   Contract Value: THB 700,000
   Contracct period : November 2003
   Scope : Design,Supply and install paging system with 22 pagers

   Client : Huawei Technologies (Thailand)
   Location: Throughout Thailand-370 BTS sites 
   Contract Value : THB 235,000,000
   Contract period : March 2005 to October 2006
   Scope : Engineering and construction permits for 370 BTS sites

   Client : Huawei Technologies (Thailand)
   Location : North-East-580 km Fibre Optic
   Contract Value: THB15,000,000
   Contract period: March 2005 to October 2006
   Scope:Approximately 580 km OSP(Fibre Optic Cable) Installation

   Client : TOT
   Location : Throughout Thailand
   Contract Value: THB 280,000,000
   Contract period : March 2003 to October 2006 
   Scope : Pit,Pipe & conduit (Design & Installation Copper & FibreOptic cab
   (Survey & Installation)Supply & Installation of MSAN

   Client : True Move
   Location : Throughout Thailand -500 Upgrade sites
   Contract Value : THB 28,000,000
   Contract period : March 2005 to October 2006 
   Scope : Engineering and construction permits for 500 BTS sites

   Client : Utel - Dtac 2007 
   Location : Throughout Thailand -58 sites
   Contract Value : THB 33,721,000
   Contract period : April 2007 to December 2007 
   Scope : Engineering and construction permits for BTS sites.

   Client : AIS 2008
   Location : Throughout Thailand 23 sites
   Contract Value : THB 33,000,000
   Contract period : Jan 2008 to December 2008
   Scope : Engineering and construction permits for 500 BTS sites

   Client : Utel - Dtac 2008 
   Location : Throughout Thailand -51 sites
   Contract Value : THB 39,000,000
   Contract period : Jan 2008 to December 2008 
   Scope : Engineering and construction permits for 51BTS sites.

   Client : True Move Phase 5.1B
   Location : Throughout Thailand – 113 sites
   Contract Value : THB 75,000,000
   Contract period : Feb 2008 to December 2008 
   Scope : Engineering and construction permits for 113 BTS sites

   Client : True Move Phase 6
   Location : Throughout Thailand – 255 sites
   Contract Value : THB 75,000,000
   Contract period : May 2008 to December 2008 
   Scope : Engineering and construction permits for 255 BTS sites